Avalon Camano Owner's Manual Page 16

  • Download
  • Add to my manuals
  • Print
  • Page
    / 34
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 15
16 Stove Installation (for qualified installers only)
© Travis Industries 100-01252_000 4101004
Exterior Factory
Built Chimney
Chimney Cap
(See the section "Chimney
Termination Requirements"
for more details)
Chimney Sections
Minimum Air Space to
Combustibles (See
Chimney Manufacturer's
Instructions)
Chimney Connector
Sections
Follow the chimney
manufacturer's
instructions and
clearances for roof
penetrations. A storm
collar and flashing are
required (some
require a radiation
shield).
}
Stove Clearances
(See the section "Stove
Placement Requirements"
for more details)
}
Follow the chimney
manufacturer's
instructions and
clearances for wall
penetrations. A
wall radiation shield
(thimble) is
required.
Optional
insulated
chase
Wall Bands
and
Supports
Insulated Tee
(with cleanout )
Min. 18"
(457mm)
clearance to
ceiling
Floor Protection
(See "Floor
Protection
Requirements"
for details)
Minimum 15' (4.57M)
Maximum 33' (10.05M)
Figure 12
Hearth Stove
Positive
Connection
Remove damper
or wire it open
Airtight Insulated
Clean-Out
Min. 18"
(457mm)
Combustible
Mantle
NOTE: The entire fireplace and
chimney must be clean, undamaged,
and meet all local building codes
(UBC, etc.). Damage must be
repaired prior to installation. The
chimney must be 15' (4.57M) to 33'
(10.05M) tall.
Floor Protection
(See the section
"Floor Protection
Requirements"
for more details)
See the section
"Stove Placement
Requirements" for
minimum clearances
required.
The liner must be
stainless steel connector
or flexible vent. Follow
the liner manufacturer's
instructions for installation
and support.
Cap and flashing
prevents water from
entering
Figure 13
Page view 15
1 2 ... 11 12 13 14 15 16 17 18 19 20 21 ... 33 34

Comments to this Manuals

No comments